HC Slovan Ice Stadium – Ústí nad Labem

Technical Performance & Reliability Report

Installation Date: July 26, 2023

  • Performance: Water freezes faster, and players have praised the improved glide of the puck and general ice quality.
  • Efficiency: The system allowed for a higher freezing temperature of the base plate. Technical effort is minimal, positively impacting energy consumption.
  • Reliability: No technical problems were recorded throughout the entire operating period.
Vladimír Evan
Chairman of the Executive Committee
Ice stadium Ústí nad Labem